Monday, 19 March 2012

More London Planning and Building Control Applications

Half-way through March (a quarter of the way through the year !!!) - gosh, where’s the time going ?  The only consolation I can find is that we are busy which can only be a good thing in the current climate. 

Works are progressing at a great rate on the extension and refurbishment of another project in central London.  The client flies in from Italy for the site meeting and then back afterwards.  With the use of the internet, distance is not a problem, as long as the whole team from builder, designers and clients are all ‘can do’ people it all works very well.

With regards to planning approvals gained, we have secured a diverse selection ranging from a horse racing yard to housing.  However, some have been challenging where we have had to meet with planning officers to ‘encourage’ them to see our way of thinking and gain the appropriate approvals.

Our sister company, Agrarian Construction, has completed the remodelling works to a large detached dwelling.  We reconfigured both the ground and first floors, creating a large open-plan family space and better bedroom space respectively.  All the works were completed on time and within the agreed budget with the client. 

I should also congratulate the Architecture Team on winning a planning appeal on behalf of one of our clients.  The scheme was challenging to say the least and the planning officer was not exactly helpful - I was certain they were more interested in meeting their targets rather than making the correct decision.  However, the Planning Inspectorate agreed with our thoughts and overturned the planner’s decision and approved the scheme much to our and the client’s joy.  We have quickly moved the scheme on and are currently compiling the Building Control drawings.

Whilst at a meeting with a Senior Planning Officer, the topic of the Government's desire to simplify the planning system arose, and I for one would have to agree with the planner's thoughts. How can the Government hope to make the planning system easier and better for all by condensing the current planning guidance (which is 1000 pages long) to a document which is just 24 pages ! Please explain how they will successfully achieve this ?  Time will tell. Is it one of those ‘Great Ideas’ that just gets kicked into the long grass when people actually sit down and think how they are going to achieve their goals. Mmm...  we shall see.

Tuesday, 31 January 2012

A New Year and the Planning Applications keep rolling on!

Well this is the Olympic year - it will be interesting to see how hosting the Olympics will affect the country. Last year when we had time off for the Royal Wedding the country ground to a halt!


We have finished the loft conversion and single storey extension in London. The client is very excited and happy so well done team.  We undertook the scheme design, planning, building control and construction works for this particular project.  We have uploaded photos of the scheme to our main site - click the link http://www.agrarian-uk.com/single-storey-extension-case-study2.html and please have a look. We welcome all comments and thoughts regarding the finished project.

January has brought some good news on the planning approvals front; we have gained approval for some flat conversions, new dwellings, stables & barns to name a few. Let us hope the planners look favourably on our schemes in the future as well.

The winter weather has not hit yet and still fairly mild which is good news as work on a new site is due to start next week.  This is for structural alterations and remodelling of a dwelling.  Agrarian Architecture has undertaken the design and building control approvals, whilst Agrarian Construction is set to undertake the construction works.  We are tasked with knocking down walls, inserting steel beams, new studwork and removal of chimney breasts, leaving the shell which the client wants to fit out themselves.  We are basically doing the messy demolition and structural works.  I will keep you posted on this project as it progresses.  It’s another project where the clients are great - long may it last.

As always we are currently in discussions with planners at numerous planning departments negotiating favourable outcomes for our clients, one of which is in connection with a shopping centre near Birmingham. 


Ecobuild Exhibition is in March. I am looking forward to this as there are lots of new products on and coming to market.  One I am particularly interested in is photovoltaic paint, which means instead of having the panels on your roof, you just have to paint your roof with this special paint! Brilliant (if it works!!)

Wednesday, 21 December 2011

Submitting Planning Applications and Building Control Applications Before Christmas !!

The final week before Christmas and we are all busy trying to get as many of the current planning and building control applications compiled and finalised before the Christmas holidays.  So it’s currently all hands to the pumps !!

The Christmas tree and decorations are up. I had the traditional battle with the lights with one set completely refusing to work.  I spent about an hour until finally losing the will to carry on and decided a trip to B&Q was in order for a new set. They look lovely -  much, much better than those old ones (mainly because they work!!).  The shopping has been done on line, no hustle and bustle just “click click” and a cup of tea.

Work on the building sites is continuing despite the poor weather. The main site in London is due for completion at the end of the week and talking to the site manager this morning, he is confident that it will be. I’m off to visit that site tomorrow to go through the snagging items to ensure a first class job is finished off perfectly.

We are currently in discussions with planners in numerous planning departments negotiating suitable and favourable outcomes for our clients. 

I’ve just ordered our tickets for the Ecobuild Exhibition in March. This is a three day event held at the Excel in London.  There are many great stands and it is well worth looking around to update the practice with the current thinking on this very important area.  It is amazing how this sector has moved and expanded over the last ten years.  Eco thinking has moved from being almost a ‘fad’ to a much needed way of design.  A typical example - we have just designed an extension for a client who wanted down lighters in one room, 25 of them!  I explained that by using LED down lighters (which work using 4 watts of power) they could run all 25 of them off the same power as an old fashioned 100watt bulb!  So multiply that up over time and that’s a great saving. Wise design can save clients money.

Have a great Christmas and a prosperous New Year everyone, and, above all, take care.

Tuesday, 29 November 2011

Ménages and Stables

November is drawing to a close, the Christmas songs are now on the radio-great for the first week but after that the novelty wears thin - Bah Humbug!!!



Over the last week we have been very busy, compiling quite a few planning applications ranging from two ménages and two sets of stables, (one in Lambourn and the other near Blackpool) which confirms that distance is no object. We have also compiled many extensions to both homes and factories.

The construction team are progressing very well in London, The extension is water-tight with some areas plastered out and drying very well.  The kitchen, bathroom and some very special radiators are enroute for delivery next week.  Without “blowing our own trumpet”, I really do think that the finished project will be stunning.  This will be immensely satisfying as the client is simply one of the kindest and nicest clients we have had over the last ten years.  She has spoilt the lads with biscuits and all sorts of goodies, and they weren’t just any biscuits, they were M&S biscuits (as the advert goes).

We also gained planning approval for schemes from London to Stratford-On-Avon.  The London scheme is for our client based in Italy. Now that planning has been approved we will progress onto the Building Control compilation and submission.  Meanwhile we are obtaining competitive quotations for the construction works.

Works are also progressing well on the conversion of a barn into a dwelling; we poured the floor slab last week with some six lorry loads all pumped into place in the space of a morning - great work chaps.

It’s amazing how different planning departments deal with applications, some being very proactive and helpful, whilst others are just simply dire.  I think the Government should have a name and shame list, I know we have one in the offices!  I can only see the problems with some of them getting worse as the cuts increase. 


 Oh well onwards and upwards, I’m off for a mince pie and cup of tea! 

Saturday, 5 November 2011

Planning and Building Regulations for Extensions


November is now upon us. It is Bonfire Night and the children are very excited. It is really noticeable how early it now gets dark. 

The veterinary practice/clinic refurbishment has finished and they are currently open for business. All of the staff have confirmed that the finished building is ‘… simply beautiful’ and that they ‘…love it’ so a big pat on the back to all those involved especially the builders who performed admirably. Well done chaps.

Works are progressing well at another site in London. The builders managed to get the loft conversion watertight before the rains came and the ground floor extension should be watertight by the end of next week, ‘fingers crossed’.  At this stage there should not be any “surprises” and the reinstatement and extension works should progress well.  The client seems very excited as they begin to see the works taking shape.  All projects have milestones, and now that we have created the shell the client can start to visualise the size and shape of the proposed extensions.

Further planning applications were submitted this month ranging from new dwellings to extensions. All are very welcome and we look forward to securing the best solution for our clients.

We also had a great recommendation from our clients in Spain. We secured planning permission for a small flat development for them in the UK which they have just sold netting a respectable profit, so congratulation to all.

Last week I had a telephone call from a client who I had not heard from for over a year, I was stunned when he told me that his partner had died of cancer in that period. She was only 41, simply tragic.  I suppose if there is anything to learn/take from this it is that life is short, be kind to all and if you can help someone, then do so.

The rugby’s finished. England suitably underperformed (but not as badly as the cricket team last month!). We will have to wait and see if the England management setup gets changed. 

Friday, 30 September 2011

Planning, Building Regulations and Building at Agrarian - We Love It!

Wow, it’s the end of September and it was 28 degrees in London -  it was beautiful, I know people moan “oh it’s too hot, it’s too cold, it’s too wet”, but just deal with it folks. There’s a lot of places around the world where they have really bad weather, tornados, hurricanes etc. 
 
One of the sites I visited was the veterinary practice/clinic refurbishment which is having the final touches from the decorators.  Below are some photos (at long last) of the ‘almost finished article’ showing the extension of the existing vet premises into the adjacent retail space previously used as a newsagents. 

External view prior to project start


External view on completion



New Consulting Room  and  New Kennel Area



The feedback from the client and the staff was "…it’s brilliant" and "…we simply love it" so well done to all concerned with that one.

The main construction team from this project have now started on another site for me but this time it’s a residential site.  The deadline is Christmas. We have had initial issues as with most refurbishment and extension projects.  On “Day Two” they opened up and removed plasterboard from some existing internal openings only to reveal decaying timber joists instead of steel beams!!  As each project has full building control approval prior to starting we had already asked our Structural Engineer “Don -  what beams should we find behind this plasterboard ? ” so due to this careful planning we were able to order new steel beams immediately whilst temporarily placing some props under the offending timber joists.


We have also passed our CRB (Criminal Records Bureau) checks for the staff that come into contact with the general public.  Good news that we passed!! However, joking aside, we consider having these checks as a progression and development for the company.  We really want to provide confidence to all our clients that they are dealing with friendly, reliable and honest people. In this day and age we think this is important.


Some more planning applications were submitted this month.  We have noticed that although the “Planning Portal” provides a “one stop shop” for the submission, it is amazing the different criteria each of the planning authorities have e.g some only take electronic drawings in A3 sizes whereas others take the larger A1. Come on chaps, surely there should be a standard! It is a Government body after all!!!


The rugby - well Scotland didn’t do themselves or England any favours last weekend. The match between the pair of them should be a hard one and I’m really looking forward to that this weekend.  The timing of the matches hasn’t been too bad either. I’m able to sit there with a large mug of tea and a bacon roll (or two!!!) (oh, brown sauce by the way) and watch the rugby as a great start to the day.

Tuesday, 20 September 2011

Planning Portal Making Planning Approval Greener





It's now half way through September and the children have gone back to school much to everyone’s relief!  Even our children I think were glad to return to school.  And I’ve just started noticing signs and offers for Christmas as well.


 Thankfully September 11th passed without any noticeable disasters which is a great relief to all. Surely everyone must be growing weary of the continual conflicts.  As our mothers would say "just bang their heads together". Mmm if only!


The veterinary practice construction works have come to an end. The contractor is undertaking the final "snagging" and the client will be in this week.  I will visit site later this week and take some final photographs.  As that project finishes so another starts, which is a 12 week program so we are looking for the builder to finish that one by Christmas.  It's a residential project (loft conversion and ground floor extension) so it must be finished for Christmas. We don’t want the client having a "chicken pot noodle" for her Christmas dinner because she hasn’t got a kitchen.



Also "pat on the back time". We have secured recognition from the government for minimising our carbon emissions during the planning application process. We have altered our processes to ensure that we use electronic means of communication as much as possible especially when making planning applications. This is saving money for our clients whilst saving the planet.  Our carbon footprint is dropping, so well done to everyone here.
 

The scheme for the student accommodation has gathered pace and should be due for submission to the Local Authority shortly.  As I reflected upon the design, I was left thinking that ‘gosh these students are very lucky’ - ensuites, crash-out areas, large plasma screens - it's more like a hotel, a far cry from the student houses of my university days! They were more like "The Young Ones" with one bathroom between six students. A kitchen with an electric cooker having only three rings working (with the smallest the only one fully functioning) so it took an hour to boil a pan of water for pasta. "Oh happy days !" (and the oven was just used for dry storage !).

Our clients in Italy are happy that their planning application has been submitted so let’s hope for the right result. 
 

The rugby world cup is beginning to gather momentum. The first two matches for England do not fill me with confidence, but hopefully they can build on it.  And a very well done to Ireland (oops - the Australians won’t like that one). The only thing that could have been worse for the Australians was  if it was England that had beaten them!